The City of Huntsville officially opened a 1.5-mile extension of the Tennessee River Greenway on July 29, creating a continuous 17-mile loop through south Huntsville and improving nonmotorized access between Aldridge Creek Greenway and the Tennessee River.
New connections, new considerations for drivers
The new segment runs from Redstone Road to Green Cove Road, linking the Aldridge Creek Greenway to Ditto Landing and the Tennessee River, city officials said. Construction began in September 2025 and finished in time for a ribbon-cutting ceremony led by Mayor Tommy Battle.
For thousands of motorists who pass through Redstone’s Gate 3 each day, the project also introduces a significant change to traffic patterns: a marked pedestrian crossing on Redstone Road just outside the installation. Planners expect the crossing to serve cyclists, runners, walkers and families traveling between the greenway and the nearby entrance to Bell Mountain Park.
- Length of extension: 1.5 miles
- Continuous loop length: 17 miles
- Endpoints: Redstone Road to Green Cove Road
City officials said the crosswalk was intentionally located away from the T-intersection to improve sight lines and safety for both motorists and greenway users. Dennis Madsen, Huntsville’s manager of urban and long-range planning, explained the design choice and urged drivers to stay alert in the area.
"We intentionally moved it a little farther away from the T-intersection, which improves visibility," Madsen said. "Drivers have a much clearer view of pedestrians and cyclists approaching the crossing, and that was an important design consideration."
Madsen also noted that the city has installed signage and markings at the crossing and reminded drivers to minimize distractions. "The biggest thing is for motorists to stay alert and recognize there will be mixed traffic in the area, including pedestrians and cyclists," he said. "As always, when you’re driving, keep your head up and stay off your phone."
What to expect at the crossing and nearby areas
The crosswalk is expected to funnel greenway users toward the park entrance for Bell Mountain Park. Officials said the decision to place the crossing slightly south of the T-intersection was made to give both drivers and pedestrians clearer sight lines.
City planners said they will monitor activity at the site before deciding whether to add further traffic-control devices. In the meantime, the crossing includes pavement markings and signage meant to make motorists aware of increased pedestrian and bicycle traffic in the corridor.
For residents who use Redstone Road daily, the new corridor provides a scenic alternative for exercise and commuting, with much of the greenway running along Redstone’s eastern boundary. The extension also strengthens links between neighborhood trails and major riverfront access points, promoting recreational use and active transportation.
| Item | Detail |
|---|---|
| Opening date | July 29, 2026 |
| Construction start | September 2025 |
| Segment length | 1.5 miles |
| Loop length | 17 miles (continuous) |
As Huntsville continues to expand greenway and trail infrastructure, residents and commuters will encounter new interaction points between motorists and nonmotorized users. Officials are asking drivers to exercise caution in the area and to report any concerns so planners can assess whether additional safety measures are necessary.
The extension not only enhances recreational access but also increases connectivity between neighborhoods and riverfront amenities, reflecting city efforts to expand active-transportation options in south Huntsville.